Vasteras, Sweden
2013: Design, Manufacture and Installation of a stand alone parcel sortation system for United Parcel Service (UPS) in Sweden. The project was to supply a full turn key service for the Design, Manufacture and installation of a parcel sortation system. Including all electrical and the manufacture and supply of the control system and operater interface. We worked with the client (UPS) to deliver the project on time and on budget. Manufacturing everything in Wiltshire and responsible for transporting everthing to Sweden. A team of installers from Cams Engineering took ten weeks to complete the installation. During the whole installation process the facility remained operational at all times and there was no disruption to the clients operations.
For Farmers, Radstock.
2014: Installation for For Farmers of five story mezzanine floors steelwork including concrete levels and the installation of all associated factory machinery. This was a long project running from January 2014 and completion was due for November 2014. Cams Engineering Ltd supplied all labour and equipment for the project with the client suppling all drawings and materials. The project was completed on time and on budget. As a CDM reportable project Cams Engineering Ltd were also responsible for every aspect of the installation including commissioning of the machinery.
Shenzen, China.
2015: Decommissioning of existing speaker manufacturing site and relocation installation. Moving from Wales, UK to new site Shenzen CHINA. This project is currently ongoing and Cams Engineering Ltd stil have engineers out in China installing the manufacturing process into its new facility. There is a scheduled further five visits planned to this new facility within 2015.
.